WP2 Manufacturing
Deliverable D2.1: REPORT ON SYSTEM DESIGN OPTIONS FOR EDGE ROBOTICS, TRACKING AND MONITORING, AND INLINE QUALITY ASSURANCE
Deliverable D2.2: 5G/6G SETUP FOR MANUFACTURING AND ROBOTICS
Deliverable D2.3: REPORT ON IMPLEMENTATION OF THE WIRELESS EDGE CONTROL ROBOTICS USE-CASE
Deliverable D2.4: REPORT ON IMPLEMENTATION OF OPTIONS FOR THE TRACKING AND INLINE QUALITY ASSURANCE SYSTEM
Deliverable D2.5: REPORT ON WORKING DEMONSTRATORS AND VALIDATION IMPLEMENTED FOR 5G/6G TECHNOLOGIES IN MANUFACTURING
WP3 Energy
Deliverable D3.1: PILOT IMPLEMENTATION PLAN
Deliverable D3.2: ENERGY DATA AND AUTOMATION ARCHITECTURE REPORT (DRAFT)
Deliverable D3.3: ENERGY DATA AND AUTOMATION ARCHITECTURE
Deliverable D3.4: ENERGY DATA AND AUTOMATION ARCHITECTURE REPORT (FINAL)
Deliverable D3.5: PILOT SITES ENERGY
Deliverbale D3.6: ENERGY PILOT ANALYSIS
Deliverable D3.7: ENERGY-AWARE BUSINESS MODELS
WP6 Technology evolution beyond 5G
Deliverable D6.1: DESCRIPTION OF THE TESTBED CAPABILITIES AND ENVISIONED EVOLUTION WITHIN THE PROJECT
Deliverable D6.2: REPORT ON THE DEPLOYMENT AND TESTING OF EVOLVED FEATURES
Deliverable D6.3: DESIGN AND IMPLEMENTATION OF REQUIRED SUB- MODELS, EXPOSURES AND INTERFACE
Deliverable D6.4: DEVELOPMENT OF AAS INSTANCES AND REALIZING THE NETWORK/ASSET ORCHESTRATION
Deliverable D6.5: FINAL REPORT ON APPLIED BEYOND 5G TECHNOLOGIES